Industrial Visit Water Treatment Plant Hinjewadi

Location : Hinjewadi Water Treatment Plant

Date of Visit: 07/08/2024

Total Number of Students: 25

Faculty Coordinator: Prof. S. D. Redekar

 Submission of WSE site visit report for Sem I of Year 2024-2025 Respected Sir,
I am submitting the report of Parvati WTP site visit report conducted on 07/08/2024 at Hinjewadi Water Treatment Plant. I request you to note the activities and observations during session conduction.

Site visit started at 09.1 5PM with a welcome note given by Prof.S.D.Redekar.Total 25 students were present on site from TE Civil class.

Activity 1: Prof. S. D. Redekar introduced about site visit topic and location to all students.

Activity 2: Students visited WTP, all processes involved in water treatment they have visited.

Activity3:Students observed coagulation unit, filtration unit, flocculation unit and SCADA Operations. Students interacted with the site supervisors, Amol Sir & cleared their doubts .

Activity4:Visit was concluded with vote of Thanks given by Prof. S. D. Redekar & asked for feedback of the session.

Photographs of conducted activities are attached below: