A visit to Mula Dam Hydro-electric Power Plant, Rahuri, A.Nagar on 10th Feb. 2017 was arranged. This was good opportunity for the students to interact with plant experts and executive engineer for better understanding of the subject and gain practical knowledge. The students studied actual procedure and working of hydel power plant. Students witnessed the components of power plant installed on Left and Right channel of the dam. They studied the type of turbine used and step up required for generation of electricity at 750 rpm. The students became aware of type of material, components and dimensions required according to head, discharge and potential of the reservoir. During the visit Total one fifty six (156) final year students were presents for this visit.
This industrial visit was very useful for the students and teachers from knowledge point of view.